Railway Station Ventilation
Railway stations have waiting halls with high ceilings and covered platforms. Ventilation keeps the waiting hall fresh and removes heat and smoke from covered platforms.
Used in this application
- Exhaust ductCarries the collected stale air all the way to the outside.
- Extract grilleCollects stale air from the room and passes it into the duct.
- Smoke extract fanExtracts smoke to the outside in the event of a fire.
- Fresh air ductCarries clean air from outside into the space.
- Air handling unit (AHU)Filters, heats or cools the air and distributes it.
The type and number of equipment items are determined at the site survey, according to the size and use of the space.
From site survey to commissioning, from one source
On railway station ventilation projects we run the whole process from a single source. Every space is different; we define the solution together with you according to the use and structure of the space.
- Site surveyWe see the space on site and define its use and requirements together with you.
- DesignWe calculate the airflow required, then design the duct route and the equipment selection.
- Ductwork fabricationWe fabricate the ducts and fittings to suit the design.
- InstallationWe install the ducts, fans and units on site.
- Testing and commissioningWe run the system, check and balance the air distribution, and hand it over.