Technical spaces
Data Centre Ventilation
Rows of cabinets produce heat without interruption throughout the building. An orderly airflow that separates the cold and hot aisles keeps the whole system safe.
Used in this application
- Air handling unit (AHU)Filters, heats or cools the air and distributes it.
- Fresh air ductCarries clean air from outside into the space.
- Supply diffuserDistributes fresh air into the room without draughts.
- Extract fanExpels stale air to the outside.
- Extract grilleCollects stale air from the room and passes it into the duct.
The type and number of equipment items are determined at the site survey, according to the size and use of the space.
From site survey to commissioning, from one source
On data centre ventilation projects we run the whole process from a single source. Every space is different; we define the solution together with you according to the use and structure of the space.
- Site surveyWe see the space on site and define its use and requirements together with you.
- DesignWe calculate the airflow required, then design the duct route and the equipment selection.
- Ductwork fabricationWe fabricate the ducts and fittings to suit the design.
- InstallationWe install the ducts, fans and units on site.
- Testing and commissioningWe run the system, check and balance the air distribution, and hand it over.